Modern water coolers for students have been installed.
Flooring in the music room, office, hallways and gym replaced
Student restrooms will be upgraded with new toilets and sinks.
Some exterior windows will be replaced during the Spring/Summer 2020
New fencing; New canopy and sidewalk; LED lighting; New ceilings in hallways; Classroom door upgrades; Cafeteria lighting; Painting of the gym and media center.
New carpet in the music room
Copyright © 2019 Florence1Builds.org - All Rights Reserved.
Powered by GoDaddy Website Builder